Construction

Starting the Roof

Posted on

Installation of the roof has started.  It is a multilayered sloping system with a base board that spans the corrugated steel deck, a layer of angled hard foam that moves water towards the downspouts, another board layer to add strength and then finally a water resistant TPO layer.  Later we will add leveled pavers on top of the TPO deck for the parts of the roof that are going to be used by the residence.